Please ensure Javascript is enabled for purposes of website accessibility

Amazon Project Basie (PDX)

Cement Deep Soil Mixing (DSM) and Displacement Grouted Columns (DGC)

Woodburn, OR

Project Description

Design and build of ground improvement for a 4.5-story building with an 823,000 square foot footprint. AGI designed a solution to mitigate static and liquefaction settlements through a hybrid system consisting of DGC columns beneath the slab on grade with a Load Transfer Platform (LTP), and DSM columns beneath isolated footings and grade beams. AGI- Fudo, JV constructed over 2,200 DSM columns to depths of 75 feet, as well as 2,650 DGC columns to 60 feet over the
course of a four-month schedule duration.

Application

Coming Soon

Geotechnical Conditions

  • Liquefaction settlement
  • Deep compressible soils

Project Info:

  • Design-Build Contractor:
    Advanced Geosolutions, Inc (AGI) and AGI-Fudo, JV
  • Developer (tenant):
    Trammell Crow company (Amazon.com, Inc
  • General Contractor:
    Layton Construction Co., LLC
  • Geotechnical Engineer:
    NV5 (GeoDesign, Inc.)

Keep in Touch