Deepwater Terminal Coal Handling Facility

Deep Soil Mixing | Load Transfer Platform

Pasadena, Texas

Project Description

Existing train tracks in a rail yard adjacent to the Houston ship channel underlain by soft clay were settling and needed to be re-ballasted by up to 2ft every year. Deep Soil Mixing was selected to improve the soils to reduce settlement under existing and new tracks. Shooflies were installed to allow AGI to install the DSM columns where needed. Considerable coordination was required to ensure all DSM work was completed without interrupting rail yard operations. A load test was performed to confirm performance.

Application

  • Limit total static and dynamic settlement
  • Liquefaction mitigation

Geotechnical Conditions

  • Artificial fill and organics
  • High plasticity clays & silts

Project Info:

  • Design-Build Contractor: Advanced Geosolutions Inc.
  • Owner: Kinder Morgan Terminals
  • Geotechnical Engineer: Fugro Consultants Inc