Downtown Stadium

Rapid Impact Compaction (RIC)

Spokane, Washington

Project Description

Advanced Geosolutions Inc. (AGI) performed Rapid Impact Compaction (RIC) to improve the ground conditions at the Downtown Stadium project in Spokane, Washington. Using data acquired, AGI created a deflection map allowing Budinger & Associates to easily determine the sensitive areas with high deflection. Once determined, Budinger & Associates performed post-improvement Standard Penetration Tests (SPT) to verify that the soil improvement achieved a minimum value of 18 blows per foot at each tested location. AGI successfully improved the fill soils and achieved the minimum SPT values required. This was the first application of RIC ever performed.

Application

  • Densification of existing fills
  • Increased bearing capacity
  • Reduced settlement of structures
  • Supported on shallow foundations

Geotechnical Conditions

  • Existing Fill
  • Basalt Rocks
  • Grave
  • Anthropomorphic debris

Project Info:

  • Design-Build Contractor:  Advanced Geosolutions Inc (AGI)
  • Owner: Spokane Public Schools
  • General Contractor:  Garco Construction
  • Geotechnical Engineer: Budinger & Associates, Inc.