Please ensure Javascript is enabled for purposes of website accessibility

El Centro Medical Office Building

Cement Deep Soil Mixing (CDSM)

El Centro, California

Project Description

State of the art multi story medical facility structure. AGI designed and constructed close to 200 CDSM columns to support the structural integrity of the building’s shallow concrete pad foundations while mitigating liquefaction potential.

Application

  • Provide improved bearing capacity
  • Mitigate liquefaction settlement
  • Limit static settlement

Geotechnical Conditions

  • Unconsolidated soil deposits
  • Gravelly sand fill to 5’
  • Layered clays and sandy silts to 35’

Project Info:

  • Design-Build Contractor: Advanced Geosolutions Inc. (AGI)
  • Developer (Tenant): PMB El Centro LLC
  • General Contractor: Pacific Building Group
  • Geotechnical Engineer: Geotechnical Professionals Inc. (GPI)

Keep in Touch