Please ensure Javascript is enabled for purposes of website accessibility

G3 Terminal

Cement Deep Soil Mixing (CDSM)

Vancouver, BC

Project Description

Excavation support and water control, for grain terminal rail receiving pit. AGI designed and installed CDSM cut-off walls along the perimeter of the receiving pit combined with a bottom seal treatment to provide a “bathtub” like configuration. This allowed for sufficient temporary support during the construction of the permanent structure.

Application

  • CDSM shoring wall for excavation support
  • Water permeation control

Geotechnical Conditions

  • Organic deposits
  • Compact sand and gravel
  • Prevalent obstructions

Project Info:

  • Design-Build Contractor: AGI Foundation Contractors ULC, Canadian subsidiary of Advanced Geosolutions Inc (AGI)
  • Owner: Bunge North America
  • General Contractor: Kiewit Corporation
  • Geotechnical Engineer: Thurber Engineering Ltd.

Keep in Touch