G3 Terminal

Cement Deep Soil Mixing (CDSM)

Vancouver, BC

Project Description

Excavation support and water control, for grain terminal rail receiving pit. AGI designed and installed CDSM cut-off walls along the perimeter of the receiving pit combined with a bottom seal treatment to provide a “bathtub” like configuration. This allowed for sufficient temporary support during the construction of the permanent structure.

Application

  • CDSM shoring wall for excavation support
  • Water permeation control

Geotechnical Conditions

  • Organic deposits
  • Compact sand and gravel
  • Prevalent obstructions

Project Info:

  • Design-Build Contractor: AGI Foundation Contractors ULC, Canadian subsidiary of Advanced Geosolutions Inc (AGI)
  • Owner: Bunge North America
  • General Contractor: Kiewit Corporation
  • Geotechnical Engineer: Thurber Engineering Ltd.