Junior Lifeguard Building

Rapid Impact Compaction (RIC)

Newport Beach, California

Project Description

Advanced Geosolutions Inc. (AGI) performed Rapid Impact Compaction (RIC) to improve the ground conditions at the Junior Lifeguard Building project in Newport Beach, California. The RIC densified the existing soils, to increase bearing capacity, and reduce settlements to acceptable limits. GEOCON West Inc., performed post-improvement Standard Penetration Tests (SPT) to verify that the soil improvement achieved a minimum value of 15 blows per foot at each tested location. AGI successfully improved the fill soils and achieved the minimum SPT values required.

Application

  • Densification of existing fills
  • Increased bearing capacity
  • Reduced settlement of structures supported on shallow foundations

Geotechnical Conditions

  • Existing Fill

Project Info:

  • Design-Build Contractor: Advanced Geosolutions Inc (AGI)
  • Owner: City of Newport Beach
  • General Contractor: TELACU
  • Geotechnical Engineer: Geocon West, Inc.