The Parcel O complex consists of a low income housing structure in urban San Francisco. AGI designed and installed CDSM columns for structural foundation support. AGI also constructed a temporary shoring wall consisting of continuous overlapping 6ft diameter CDSM columns to retain the soil of the upper level work pad while work was being carried out at the basement level.