Installation of over 600 DGCs for the battery storage facility at the Moss Landing Power Plant. Nominal 16-inch diameter DGCs were specified for a 100-kip design
load in order to provide the required bearing capacity beneath the slab-on-grade foundation. The DGCs also served the purpose of limiting total and differential
settlements within tolerable limits.