Moss Landing ML350 Battery Storage

Helical Piles | Structural Foundations

Helical Piles Moss Landing, California

Project Description

AGI performed Specialty Piling work at the Moss Landing Power Plant ML350 Battery Storage project in Moss Landing, CA. The intent of the piling work is to provide structural foundations for the new battery storage facilities. 2,045 single-helix steel piles were installed; additionally, each pile was cut to design elevation and capped. The helical piles were used for faster, cleaner installations that can be loaded immediately to meet project milestones with simultaneous operations. AGI tracked the pile installations by recording depth, inclination, and torque at each location, which allowed the GC Burns & McDonnell to proceed with simultaneous operations without conflict to their schedule.

Project Award: 2024 Regional Best Project (Energy/Industrial) AND Excellence in Safety Award

Application

  • Provide structural foundations to support new
    battery storage facilities

Geotechnical Conditions

  • Saturated Fat Clay
  • Saturated Loose Sand

Project Info:

  • Design-Build Contractor: Advanced Geosolutions Inc (AGI)
  • Developer (Tenant): Vistra
  • General Contractor: Burns & McDonnell
  • Geotechnical Engineer: Ninyo & Moore